“Our systems have saved our customers over 10,000 tonnes of CO2e.”
It is the kind of line that appears on a lot of websites. It might be completely true. The problem is that nobody reading it can tell, and increasingly, somebody will ask.
An inventory figure comes with a method behind it. An impact claim is a statement about cause and effect, which means it needs to be built rather than simply measured. Five things make the difference.

An impact claim is always a comparison. You are saying emissions were lower than they would otherwise have been, so you need a clear account of what otherwise means.
That might be the customer’s measured consumption before you did anything, which is the strongest option. It might be the equipment or process they would have bought instead, based on what they actually considered. It might be a published industry average, which is the weakest option but sometimes the only one available.
Write the baseline down before the project starts, or at least before you take credit for it. A baseline chosen afterwards tends to be the one that produces the best number, and readers know this.
Be careful with the counterfactual. If a customer was legally required to upgrade anyway, the comparison is against the compliant alternative, not against doing nothing.
Most emissions reductions have more than one parent. A building’s energy use falls because a new system was installed, and because the controls were set properly, and because the occupants changed how they use the space, and because the weather was milder.
Claiming the whole reduction when you supplied one component is the fastest way to lose credibility, particularly if another supplier is claiming it too.
There is no universal formula. What matters is that you state your share and explain the basis for it. “We supplied and commissioned the system; the 38 tonne reduction reflects metered consumption before and after, and we have not adjusted for the lighting upgrade the client completed in the same period” is a stronger sentence than a bigger unqualified number.
Say whose emissions moved and over what period.
A reduction in a customer’s operations is not a reduction in yours. If the benefit accrues over the ten-year life of an installation, say so rather than booking a decade of savings into one year. If the change moved emissions somewhere else rather than removing them, that belongs in the account too.
This is also where rebound effects live. Efficiency improvements sometimes lead to more use of the thing that became cheaper to run. It is not always material, but a claim that shows no awareness of it reads as naive.
When you have a range, use the low end.
This is counterintuitive for anyone writing marketing copy, and it is the single most effective thing you can do. A conservative figure you can defend is worth more commercially than an optimistic one that invites challenge, because the first one survives the meeting where somebody asks how you got there.
It also protects you from the asymmetry of being wrong. An understated claim costs you a little credit. An overstated one costs you trust in everything else you have said.
Every impact figure rests on assumptions. Emission factors, operating hours, equipment lifetime, utilisation, degradation, what the customer would have done instead.
List them. A sceptical reader who can see your assumptions and disagrees with one of them is in a conversation with you. A sceptical reader who cannot see any assumptions concludes there are none, or that you are hiding them.
Name your emission factors and their source and vintage. Factors change year to year, and a saving calculated with 2019 grid intensity will not match one calculated with this year’s.

Take a lighting and controls upgrade for a manufacturing client.
The weak version: “We saved our client 180 tonnes of CO2e.”
The credible version: metered electricity consumption for the twelve months before works, compared with the twelve months after, weather-corrected where heating interacts, with the client’s separate compressor replacement excluded from the claim. Converted using the published UK grid factor for the relevant year, named in the footnote. Reported as the first-year saving, with the projected ten-year figure stated separately and clearly labelled as a projection. Assumptions listed: operating hours unchanged, production volume within 5% of the prior year, no change to shift patterns.
The second version produces a smaller number. It is also the one that survives a procurement team’s follow-up question, and the one you can still stand behind in three years.
All of this is straightforward to capture during a project and nearly impossible to reconstruct afterwards. The before readings, the client’s stated alternative, the specification, the commissioning date, the assumptions you made at the time.
Keep a simple record per project. When a buyer asks how you arrived at a figure, or when the reporting standards catch up, the work is already done.
Part 4 covers how to present it.